|

|
Equipment
Topographical surveys:
specialised in places where access is difficult

- 1 Euromach Super Jolly M88
walking excavator
- 2 STENUICK BB40 drilling
column for probing on the ground and in cliffs up to 60 linear metres,
diameter 70 to 210 mm, tubing system.
- 2 Montabert Wagondrills
on special cliff frame
- 1 PIXI hydraulic column
- Corers from 50 to 250 mm
- Full NIKON laser workstation
- Test bore parameter recorder
- Instrumentation (incline
meter...)
- Lightweight structure investigation
and measurement workshop
- Drilling and cementation
injection equipment

Engineering office
(logistics, IT and software)
- PETAL (LCPC): calculation
of slope stability with superimposed soils
- PROSPER (LCPC):
slope and embankment stability calculation, calculation of roadway stability
with or without reinforcement
- AUTOCAD: drawing
- TERRA MODELER:
topography
- SURFER 3D: topography
- COREL DRAW: presentation
- PHOTOSHOP: presentation
- Internal software
for reinforcement calculations, general cliff stability calculations,
plane slide calculations, tunnel roof stability calculations.
Experimental site
for studying cliff reinforcement with landscaping to fit into the environment.
Experiment from 1998 to 2002 on a cliff wall 40 metres high and 200 metres
wide. This is contributing to the definition of a methodology for investigations,
stability calculations and assessment of the dimensions required for reinforcement
structures.
|